PROJECT NAME: Rycroft 48-inch 2017-03-27 (CSM Maintenance Repair 2017-009) Rehabilitation of Sewer Lines on Oahu-contract No. 006 (Job No. W1-16)
PROJECT DESCRIPTION: Mocon Corporation will be repairing the 48" sanitary sewer line on Rycroft Street from Piikoi to Pensacola St. using the CIPP method. The work will consist of bypassing the existing sewer using a temporary buried pipe, cleaning and CCTV of the existing sewer line, and CIPP Liner installation in the pipe. Work will be performed primarily in the daytime with some limited overnight activity.
PROJECT AREA: Rycroft Street – Approximately 800 feet between Piikoi and Pensacola St.
PROJECT TIMEFRAME: March 1, 2018 – December 31, 2018
If you have concerns about this project, please email Darin Fogg at darinfogg@yahoo.com within 30 days from the date of this letter.